WRWEO is looking for experienced trail workers to Brush Cut Loop 2 (Mi’kmaw Hill Loop) 1.3 km: 0.3 kms on side “C” and 1 km on side “A”; and all of Loop 3 (The Bluff Loop) 7.6 kms. Here is a link to our Map.
Using a brush cutter and hand trimmer, cut the vegetation on both sides of the trail down to a maximum height of 2’’ and a total width of 3 feet , 1.5 feet on each side of the centre line.
Pruning of branches and growth should only be done to height of 8 feet tall (any branches taller than this should not be pruned or cut back).
When pruning branches the branch should be cut flush with the trunk of the tree. There should not be any branch stumps sticking out of the tree.
As much as possible do not cut or disturb low growth shrubs such as broom crowberry.
Please email info@wrweo.ca in order to obtain a copy of our proposal submission form, please indicate that you want the brush cutting proposal submission form, references may be required. Those interested will have to provide a fixed price for each piece of work by midnight on 30th day of October 2019. The contract may be awarded before the 30th of October, 2019.
Trail Hardening
Using found stone, fill in the Identified Areas needing rock hardening in a manner that provides for solid footing through the Identified Area. These areas tend to be wet areas or low lying areas that can accumulate water during wet seasons. WRWEO is looking for the provision of 360 feet of on trail rock hardening (300 feet to be identified on Pot Lake Loop and 60 feet to be identified on Mi’kmaw Hill Loop).
This will require pry bars to loosen and roll found stone to the Identified Areas as well as picks and shovels to loosen the soil so that the found stone can sit on the trail properly and provide solid footing to trail users. It is important that none of the found stone, once placed on the trail in the Identified Area, moves or shifts when walked upon. The stone tread that is created should be continuous; there should not be any significant gaps of more than a few inches in between the stones such that trail users should not have to stretch their stride or jump while stepping from one stone to another. The stones should also be level with one another such that trail users do not need to step up or down more than a few inches from stone to stone.
Please email info@wrweo.ca in order to obtain a copy of our proposal submission form, please indicate that you want the trail hardening proposal submission form, references may be required. Those interested will have to provide a fixed price for each piece of work by midnight on 30th day of October 2019. The contract may be awarded before the 30th of October, 2019.
WRWEO is concerned about ensuring that our impacts on this wilderness are are minimized. We have received negative comments about our maintenance activities in the past and had drafted a response to a concerned citizen and trail user back in 2015. Please check it out and feel free to contact us at info@wrweo.ca if you want further information or to engage with us further on this topic. https://wrweo.ca/wp/about-wrweo/trail-maintenance/